How Automated Construction Equipment saves money and time
In an effort to remain at the forefront of its industry, a leading Canadian developer invited Automated Construction Equipment (ACE) to analyze its framing processes in its mixed use projects including both high rise and low rise buildings. Through the introduction of 2 different ACE systems, the results were both dramatic and beneficial.
In the case of the medium density, low rise project, automated framing machines
reduced the framing schedule by over 50% from 11 weeks to 4 while at the same time reducing the labour cost by
a third. In addition, the ACE equipment eliminated any delays due to Canadian weather.
In the high rise project, ACE equipment
reduced the framing schedule by 50% from 22 weeks to 11 while at the same time
reduced costs by 25%. The developer is able to deliver the suites to his end customers nearly
4 months faster than traditional construction methods, which has improved the entire pro-forma and bottom line of the project in dramatic fashion.